QUESTION 1: Define the term PROCESS and describe the relationship between PROCESSES and PROCESS CONTROL BLOCKS also specify the steps performed by an OS to create a new process.
QUESTION 2:
This question is to better understand the Management of Application Execution by using the analogy between restaurant and computer.
CPU is expecting to have two things for each application’s process section, a) data (this is ingredients for the cook) and b) Instructions (specific order of the food (recipe)). Consider the below-given parameters while working on questions 2 and 3.
The parameters of the OS and Restaurant analogy.
CPU: The cook who prepares the food based on given ingredients (data) and instructions. It will receive data and instructions for each process.
PROCESS: The food preparation. The customer wants to have/order food. Each food order should be prepared based on customers’ needs. Each food order considers to be a process and comes with data and instructions. Customers may order more than one process (i.e. salad, drink, and pizza). That means 3 different processes. Consider the customer as an application in computer OS. In this example, one application comes with three processes.
OPERATING SYSTEM: The rules of the restaurant. The restaurant should be run based on these rules. Like in the computer, all computer resources, CPU, Memory, etc. have been managed based on OS. The waiter takes the orders from users (restaurant customers). And make sure all customer’s orders were fulfilled
MAIN MEMORY: That keeps the customer orders (Data and Instructions) well organized. In Computer this is RAM.
PROCESS STATES:
Develop State Process Model for this system. the Your name should be on the diagram
QUESTION 3: Develop a timeline diagram for the process states to trace the given process execution timeline. See the memory address, process, and dispatcher in the table. See Figure 3.7 in your textbook.
Time | Address | Processes | Time | Address | Processes | |
1 | 4011 | A | 18 | 100 | Dispatcher | |
2 | 4012 | A | 19 | 101 | Dispatcher | |
3 | 4013 | A | 20 | 102 | Dispatcher | |
4 | 100 | Dispatcher | 21 | 4014 | A | |
5 | 101 | Dispatcher | 22 | 4015 | A | |
6 | 102 | Dispatcher | 23 | 4016 | A | |
7 | 5000 | B | 24 | 100 | Dispatcher | |
8 | 5001 | B | 25 | 101 | Dispatcher | |
9 | 5002 | B | 26 | 102 | Dispatcher | |
10 | 5003 | B | 27 | 5004 | B | |
11 | 100 | Dispacher | 28 | 5005 | B | |
12 | 101 | Dispacher | 29 | 5006 | B | |
13 | 102 | Dispacher | ||||
14 | 1100 | C | ||||
15 | 1101 | C | ||||
16 | 1102 | C | ||||
17 | 1103 | C |
Your name must be on the timeline diagram.
with references
Assignment 2
What is the relationship between the Project Life Cycle (PLC) and the Systems Development Life Cycle (SDLC)? Please provide specific examples.
You must reply to two students. Each reply must be 100 words. Your original post must be 300 words.
with references
Note:- APA format with 700 to 800 words.