Description
Scenario
Task 1
Critically evaluate appropriate sources of data, prepare and justify the following documents for the proposed project, in appropriate formats:-
i) An outline cost estimate;
ii) A cost breakdown to primary element level.
iii) A cost breakdown to secondary element level.
iv) A detailed elemental cost plan
Evaluate the data used at each stage through value engineering techniques, to ensure costs are maintained within cost limits and so that the client receives value for their money.
Task 2
Critically evaluate the role of the Quantity Surveyor during the design phase of a modern construction project, through their use of Traditional Cost Modelling techniques, as the design evolves.