You are employed by a local surveying company and have been approached by the local authority to carry out a topographic survey of a plot of land at the Future Skills Campus, Salford. The topographic survey is required for the initial and detailed design process. Part of the requirement is to set a control network of stations that can be used for future surveys and to aid in the setting out once construction commences.
You are required to produce a report on the plot for submission to the client including the following:
The client requires the network to be robust with a minimum of five stations.
Undertake the following:
lengths.
Calculate from the survey the corrected eastings, northings and heights of each of the stations.